Update Terakhir : 14 Aug 2020
TABEL 3.9 |
PROYEK PEMBANGUNAN
DESA UNTUK PENUNJANG ADMINISTRASI |
DAN BIAYA
OPERASIONAL PENYELENGGARAAN HONOR PAUD |
MENURUT SUMBER BIAYA DAN
DESA / KELURAHAN |
|
2019 |
|
|
Desa / Kelurahan |
Jumlah |
Sumber Biaya ( 000 rupiah ) |
Jumlah |
|
Proyek ( Unit ) |
Swadaya |
Pemkab |
Pemprov |
Pempus/ BLN |
|
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
|
001.
Kebondalem |
- |
- |
- |
- |
13.000 |
13.000 |
002.
Mundusewu |
- |
- |
- |
- |
19.750 |
19.750 |
003.
P a k e l |
- |
- |
- |
- |
14.640 |
14.640 |
004.
Karangan |
- |
- |
- |
- |
5.000 |
5.000 |
005.
Ngampungan |
- |
- |
- |
- |
14.800 |
14.800 |
006.
Jenisgelaran |
- |
- |
- |
- |
5.550 |
5.550 |
007.
Bareng |
- |
- |
- |
- |
14.300 |
14.300 |
008.
T e b e l |
- |
- |
- |
- |
5.000 |
5.000 |
009.
Mojotengah |
- |
- |
- |
- |
6.100 |
6.100 |
010.
Banjaragung |
- |
- |
- |
- |
21.250 |
21.250 |
011.
Nglebak |
- |
- |
- |
- |
24.600 |
24.600 |
012.
Pulosari |
- |
- |
- |
- |
1.200 |
1.200 |
013.
Ngrimbi |
- |
- |
- |
- |
18.200 |
18.200 |
|
|
|
|
|
|
|
Jumlah |
0 |
0 |
0 |
0 |
163.390 |
163.390 |
Sumber :
Kantor Desa se Kec. Bareng |
|
|
|
|
|
|
|
|
|
|